Yellow industrial overhead crane with a grab bucket, positioned in a facility against a cloudy sky.
Blue gantry crane in an industrial yard with workers and a forklift moving wooden crates.
Yellow gantry crane on a construction site with traffic cones and equipment in the background.
Yellow overhead gantry crane lifting a pallet of materials inside an industrial warehouse.
Yellow gantry cranes under a clear blue sky at an industrial site.
Yellow industrial overhead crane with a grab bucket, positioned in a facility against a cloudy sky.
Yellow industrial overhead crane with a grab bucket, positioned in a facility against a cloudy sky.
Blue gantry crane in an industrial yard with workers and a forklift moving wooden crates.
Yellow gantry crane on a construction site with traffic cones and equipment in the background.
Yellow overhead gantry crane lifting a pallet of materials inside an industrial warehouse.
Yellow gantry cranes under a clear blue sky at an industrial site.
Heavy Duty Box Type Shipbuilding Gantry Frame Goliath Crane Double Girder Gantry Crane Price
$2800
FOB
MOQ:
1
Shipping:
Express, Land Transport, Sea Transport, Air Transport
Product details
FAQ
Essential details
MOQ:1
Lead time:30–45 days
Shipping:Express, Land Transport, Sea Transport, Air Transport
Specification Number:SGC-01
Product Introduction

Product Introduction

ItemSingle GirderDouble GirderRTGRMGSemi
Lifting Capacity2-32t5-500t5-500t30-75t2-200t
Lifting Height6-20m6-35m6-18m12-21m6-20m
Span8-35m18-50m5-35m18-35m8-30m
Working ClassA3/A4/A5A3/A4/A5/A6/A7A3/A4/A5/A6/A7/A8A6/A7/A8A3/A4/A5/A6
Running Speed2-20m/min (Hoist)10-40.1m/min (Trolley)2-20m/min (Trolley)45-56m/min (Trolley)20m/min (Hoist) 37-40.1m/min (Trolley)